| Removing the old luton. |
| Same walls as above but in the process of being shortened. Note the lack of support in the centre. |
| Roof cut back to start of new luton. |
| New bathroom and bedroom windows. |
| The cab now tilts, it was not able to before but it will be possible with our new design. |
| How the original windows were installed, no framing what so ever, cut a hole and glue it in. |
| New framing around crawl -through opening. |
| Rust |
| Rust |
| Removing the rust tok a while |
| Corner of windscreen with first thin bog. |
| Fixed |
| Alot of steel and work went into this. |
| Dan welding the floor frame of new luton |
| Bottom half of frame in place. |
| Bottom frame |
| Frame almost done. |
| Frame done, cab filler primed |
| Cab with primer |
![]() |
| Aluminium going on. |
![]() |
| Roof |
![]() |
| More aluminium |
![]() |
| Rear of roof, thinking of putting a solar panel on the slope. |