Removing the old luton. |
Same walls as above but in the process of being shortened. Note the lack of support in the centre. |
Roof cut back to start of new luton. |
New bathroom and bedroom windows. |
The cab now tilts, it was not able to before but it will be possible with our new design. |
How the original windows were installed, no framing what so ever, cut a hole and glue it in. |
New framing around crawl -through opening. |
Rust |
Rust |
Removing the rust tok a while |
Corner of windscreen with first thin bog. |
Fixed |
Alot of steel and work went into this. |
Dan welding the floor frame of new luton |
Bottom half of frame in place. |
Bottom frame |
Frame almost done. |
Frame done, cab filler primed |
Cab with primer |
![]() |
Aluminium going on. |
![]() |
Roof |
![]() |
More aluminium |
![]() |
Rear of roof, thinking of putting a solar panel on the slope. |